TeamEV
Well-Known Member
Some of the latest news:
The RAN in King of Prussia, Pennsylvania is under construction with 8 charging dispensers at KoP Mall. The pin on the MyMaps should be more or less accurate.
The RAN in Tallahassee, Florida will have a total of 14 charging dispensers installed in the parking lot of the REI. I posted the permit a while back, but the site plans have recently surfaced. I used them as a prop for an April Fools day joke that fell very flat, so that's the context behind the Tweet.
I've also included a full plan view photo, and one of the site plan pages as a PDF.
And last, but also definitely least important, the permit for Cabazon has been updated to indicate that 8 charging dispensers are planned.
The RAN in King of Prussia, Pennsylvania is under construction with 8 charging dispensers at KoP Mall. The pin on the MyMaps should be more or less accurate.
The RAN in Tallahassee, Florida will have a total of 14 charging dispensers installed in the parking lot of the REI. I posted the permit a while back, but the site plans have recently surfaced. I used them as a prop for an April Fools day joke that fell very flat, so that's the context behind the Tweet.
I've also included a full plan view photo, and one of the site plan pages as a PDF.
And last, but also definitely least important, the permit for Cabazon has been updated to indicate that 8 charging dispensers are planned.
Sponsored
Attachments
-
716.5 KB Views: 13