Gshenderson
Well-Known Member
- First Name
- Greg
- Joined
- Sep 28, 2019
- Threads
- 13
- Messages
- 1,229
- Reaction score
- 2,768
- Location
- Park City, UT / Kemmerer, WY
- Vehicles
- 2015 Tesla S 85D, 2019 4Runner TRD Offroad, R1T
- Thread starter
- #1
Since WY is currently a charging desert for non-Tesla charging, I thought I’d create a thread so folks can post updates as they learn about charger plans for the state.
I drove to Evanston today to check out a reported Electrify America station under construction at the Smiths there. Sure enough, there it was!
Construction guys said they will be done within the next two weeks, but did not know when it would actually open.
It looks like EA also has plans for Rawlins and Cheyenne on I-80, as well as Casper and Gillette. Anyone know if any of those are under construction?
Evanston to Rawlins is 210 miles. That’s going to be a stretch for large pack trucks in WY wind and weather. They really need another one in Rock Springs or Green River. It looks like Rivian has plans for a RAN station there, but who knows when that will come online. s00n?
I drove to Evanston today to check out a reported Electrify America station under construction at the Smiths there. Sure enough, there it was!
Construction guys said they will be done within the next two weeks, but did not know when it would actually open.
It looks like EA also has plans for Rawlins and Cheyenne on I-80, as well as Casper and Gillette. Anyone know if any of those are under construction?
Evanston to Rawlins is 210 miles. That’s going to be a stretch for large pack trucks in WY wind and weather. They really need another one in Rock Springs or Green River. It looks like Rivian has plans for a RAN station there, but who knows when that will come online. s00n?
Sponsored