lg3103
Well-Known Member
- First Name
- Lars
- Joined
- Nov 16, 2020
- Threads
- 25
- Messages
- 320
- Reaction score
- 769
- Location
- Denver, CO
- Vehicles
- VW Atlas, Mini SE
- Occupation
- Director
Went by the location yesterday and there were several contractors on site (plumbing, mechanical, electrical). Couldn't take pictures of the back of the building where chargers etc. will be. Will drop by again next week when I'm in the area. Lots of permits were approved on Monday including the electrical info that shows all the chargers (see below):
PERMIT SCOPE OF WORK
Scope of Work (Detail exactly what activities you are performing under this permit):
ELECTRICAL ENGINEER: CARLTON FRETWELL, PE#34235 CHANGE OF USE OF EXISTING TENANT SPACE TO AUTOMOTIVE REPAIR SHOP AND SUPPORTING OFFICE SPACE. 21,219 SQUARE FEET OF F-1 (MODERATE-HAZARD FACTORY INDUSTRIAL) SPACE. 3,820 SQUARE FEET OF B (BUSINESS). EXISTING SERVICE AND NEW DISTRIBUTION. EXISTING 1500KVA, 277/480V, 3PH, 4W PADMOUNT UTILITY XFMR. EXISTING 2000A, 277/480V, 3PH, 4W SERVICE CONNECTION CABINET WITH UTILITY METER PROVISION. EXISTING MAIN SWITCHBOARD MSB WITH SPD AND 2000A LSIG MAIN CIRCUIT BREAKER AS SERVICE DISCONNECT. NEW 200A CB IN MSB TO FEED NEW PANEL H1. 125A CB IN PNL H1 TO FEED NEW 75 KVA XFMR. XFMR TO FEED NEW PANEL L1 (250A MCB). NEW 200A CB IN MSB TO FEED NEW PANEL H2. 125A CB IN PNL H2 TO FEED NEW 75 KVA XFMR. XFMR TO FEED NEW PANEL L2 (250A MCB). NEW 200A CB IN MSB TO FEED NEW PANEL H3. 70A CB IN PNL H3 TO FEED NEW 45 KVA XFMR. XFMR TO FEED NEW PANEL L3 (150A MCB). NEW 175A CB IN MSB TO FEED NEW 112.5KVA XFMR. XFMR TO FEED NEW PANEL EV (400A MCB). NEW 600A CB IN MSB TO FEED NEW L3 CHARGING CABINET. NEW CIRCUITS FOR NEW RECEPTACLES, LED LIGHTING FIXTURES AND EQUIPMENT. NEW LIGHTING CONTROLS. EXIT SIGNS WITH BATTERY BACKUP. EM LIGHTING UNITS AND EM BATTERY IN FIXTURES FOR EGRESS LIGHTING. NEW EQUIPMENT OF NOTE: COFFEE SYSTEM, 208V, 1PH, 30A CKT. ROOFTOP UNITS, 480V, 3PH, 37.9 AND 26MCA EACH. FAN POWERED BOXES, 480V, 3PH, 7KW AND 20KW EACH. WATER HEATER, 480V, 3PH, 8KW. SPLIT SYSTEMS, 208V, 1PH, 13 AND 25 MCA EACH. AIR COMPRESSOR, 480V, 3PH, 7.5HP. TIRE BALANCER, 208V, 1PH, 10A. TIRE CHANGER, 208V, 1PH, 15A. ALIGNMENT RACK, 208V, 1PH, 26A. 2-POST LIFTS, 208V, 1PH, 40A CKT EACH. FORKLIFT CHARGER, 480V, 3PH, 10.5A. LEVEL 2 CHARGERS, 208V, 1PH, 48A EACH. LEVEL 3 CHARGERS, 480V, 3PH, TOTAL OF 448A. GANTRY CRANE AND BATTERY LIFT TABLE, 208V, 1PH, 12A. DRYER, 208V, 1PH, 30A CKT. ALL OTHER EQUIPMENT REQUIRES 20A, 120V CIRCUIT CONNECTIONS. AIC: MSB, 65KA FULLY RATED. PANELS H1, H2, 35KA FULLY RATED. PANEL H3, 14KA FULLY RATED. PANELS L1, L2, L3, EV, 10KA FULLY RATED. *** UNDER THE 2020 NEC *** *** UNDER THE 2018 IECC/2019 DBCA *** *** PRESCRIPTIVE METHOD USED FOR ENERGY CODE COMPLIANCE *** *** AUTOMATIC LIGHTING CONTROLS AS REQUIRED PER 2018 IECC *** *** COMMISSIONING OF LIGHTING CONTROL SYSTEMS IS NOT REQUIRED ***
PERMIT SCOPE OF WORK
Scope of Work (Detail exactly what activities you are performing under this permit):
ELECTRICAL ENGINEER: CARLTON FRETWELL, PE#34235 CHANGE OF USE OF EXISTING TENANT SPACE TO AUTOMOTIVE REPAIR SHOP AND SUPPORTING OFFICE SPACE. 21,219 SQUARE FEET OF F-1 (MODERATE-HAZARD FACTORY INDUSTRIAL) SPACE. 3,820 SQUARE FEET OF B (BUSINESS). EXISTING SERVICE AND NEW DISTRIBUTION. EXISTING 1500KVA, 277/480V, 3PH, 4W PADMOUNT UTILITY XFMR. EXISTING 2000A, 277/480V, 3PH, 4W SERVICE CONNECTION CABINET WITH UTILITY METER PROVISION. EXISTING MAIN SWITCHBOARD MSB WITH SPD AND 2000A LSIG MAIN CIRCUIT BREAKER AS SERVICE DISCONNECT. NEW 200A CB IN MSB TO FEED NEW PANEL H1. 125A CB IN PNL H1 TO FEED NEW 75 KVA XFMR. XFMR TO FEED NEW PANEL L1 (250A MCB). NEW 200A CB IN MSB TO FEED NEW PANEL H2. 125A CB IN PNL H2 TO FEED NEW 75 KVA XFMR. XFMR TO FEED NEW PANEL L2 (250A MCB). NEW 200A CB IN MSB TO FEED NEW PANEL H3. 70A CB IN PNL H3 TO FEED NEW 45 KVA XFMR. XFMR TO FEED NEW PANEL L3 (150A MCB). NEW 175A CB IN MSB TO FEED NEW 112.5KVA XFMR. XFMR TO FEED NEW PANEL EV (400A MCB). NEW 600A CB IN MSB TO FEED NEW L3 CHARGING CABINET. NEW CIRCUITS FOR NEW RECEPTACLES, LED LIGHTING FIXTURES AND EQUIPMENT. NEW LIGHTING CONTROLS. EXIT SIGNS WITH BATTERY BACKUP. EM LIGHTING UNITS AND EM BATTERY IN FIXTURES FOR EGRESS LIGHTING. NEW EQUIPMENT OF NOTE: COFFEE SYSTEM, 208V, 1PH, 30A CKT. ROOFTOP UNITS, 480V, 3PH, 37.9 AND 26MCA EACH. FAN POWERED BOXES, 480V, 3PH, 7KW AND 20KW EACH. WATER HEATER, 480V, 3PH, 8KW. SPLIT SYSTEMS, 208V, 1PH, 13 AND 25 MCA EACH. AIR COMPRESSOR, 480V, 3PH, 7.5HP. TIRE BALANCER, 208V, 1PH, 10A. TIRE CHANGER, 208V, 1PH, 15A. ALIGNMENT RACK, 208V, 1PH, 26A. 2-POST LIFTS, 208V, 1PH, 40A CKT EACH. FORKLIFT CHARGER, 480V, 3PH, 10.5A. LEVEL 2 CHARGERS, 208V, 1PH, 48A EACH. LEVEL 3 CHARGERS, 480V, 3PH, TOTAL OF 448A. GANTRY CRANE AND BATTERY LIFT TABLE, 208V, 1PH, 12A. DRYER, 208V, 1PH, 30A CKT. ALL OTHER EQUIPMENT REQUIRES 20A, 120V CIRCUIT CONNECTIONS. AIC: MSB, 65KA FULLY RATED. PANELS H1, H2, 35KA FULLY RATED. PANEL H3, 14KA FULLY RATED. PANELS L1, L2, L3, EV, 10KA FULLY RATED. *** UNDER THE 2020 NEC *** *** UNDER THE 2018 IECC/2019 DBCA *** *** PRESCRIPTIVE METHOD USED FOR ENERGY CODE COMPLIANCE *** *** AUTOMATIC LIGHTING CONTROLS AS REQUIRED PER 2018 IECC *** *** COMMISSIONING OF LIGHTING CONTROL SYSTEMS IS NOT REQUIRED ***
Sponsored