Could be a while before the R2s start rolling out.

Georgia Rivian plant to resume construction

After a pause due to high costs, the electric vehicle manufacturer anticipates work on the project near Atlanta to begin in 2026.

https://www.constructiondive.com/news/georgia-rivian-resume-construction-doe/737872/

"Rivian anticipates that construction will begin in 2026 with production of the company’s R2 SUVs and R3 crossover vehicles starting in 2028."
Sponsored

 

kurtlikevonnegut

Well-Known Member
Joined
Sep 1, 2021
Threads
25
Messages
2,357
Reaction score
6,514
Location
SC/TX
Vehicles
R1T QM, Honda Odyssey
Clubs
 
Could be a while before the R2s start rolling out.
I assume you mean R3. R2 will be built at the current Normal, IL plant to start until Georgia comes on line.
 

MountainBikeDude

Well-Known Member
First Name
Adam
Joined
Jun 20, 2019
Threads
45
Messages
2,423
Reaction score
5,171
Location
Vancouver
Vehicles
2023 El Cap Quad Motor R1T (Selling the Xterra)
Clubs
 
I assume you mean R3. R2 will be built at the current Normal, IL plant to start until Georgia comes on line.
Both R2 and R3 models were slated to be produced there. Rivian just altered plans slightly to bring some of the R2's production to Normal to expedite it's market release and further help the company reach profitability while they work to bring the Georgia plant online.
 

DuoRivian

Well-Known Member
Joined
Sep 3, 2023
Threads
2
Messages
727
Reaction score
865
Location
California
Vehicles
Rivian R1T and an R1S
Occupation
IT
Clubs
 
I thought the site had been cleared and graded so wondering why it will take 12 months before they start construction. If they could do it sooner R3 could be 2027
not 2028. Must have their reasons, just curious.
 

Sponsored

kurtlikevonnegut

Well-Known Member
Joined
Sep 1, 2021
Threads
25
Messages
2,357
Reaction score
6,514
Location
SC/TX
Vehicles
R1T QM, Honda Odyssey
Clubs
 
I thought the site had been cleared and graded so wondering why it will take 12 months before they start construction. If they could do it sooner R3 could be 2027
not 2028. Must have their reasons, just curious.
Maybe anticipating legal challenges to the loan and not wanting to jump the gun again with timeline expectations.
 

R1SFamilyGuy

Well-Known Member
Joined
May 3, 2023
Threads
25
Messages
282
Reaction score
185
Location
NJ
Vehicles
Mazda CX-5
Occupation
I do software things
Both R2 and R3 models were slated to be produced there. Rivian just altered plans slightly to bring some of the R2's production to Normal to expedite it's market release and further help the company reach profitability while they work to bring the Georgia plant online.
That’s right. Normal will have annual capacity of 155K R2 vehicles
Where can I read more about this? TIA!
 

vandy1981

Well-Known Member
Joined
Jul 25, 2023
Threads
19
Messages
715
Reaction score
1,375
Location
USA
Vehicles
2023 R1S PDM MP, 2019 Jaguar I-Pace HSE
This is actually good politically. They're reminding Georgia politicians of the jobs that are going to come with this factory at a time when their DOE loan is going to receive a lot of scrutiny.
 

UnsungZero_OldTimeAdMan

Well-Known Member
First Name
Barnum
Joined
Mar 20, 2023
Threads
37
Messages
4,436
Reaction score
5,959
Location
SoCal
Vehicles
'23 GW Quad-Large R1T "Ghost"
Occupation
Advertising Circus
This is actually good politically. They're reminding Georgia politicians of the jobs that are going to come with this factory at a time when their DOE loan is going to receive a lot of scrutiny.
My thoughts exactly... the carrot and the stick.
 

SANZC02

Well-Known Member
First Name
Bob
Joined
Feb 11, 2021
Threads
40
Messages
6,403
Reaction score
10,930
Location
California
Vehicles
Tesla Model S, LE - R1S
Occupation
Retired
I thought the site had been cleared and graded so wondering why it will take 12 months before they start construction. If they could do it sooner R3 could be 2027
not 2028. Must have their reasons, just curious.
My guess is playing it conservatively until they start shipping the R2 out of Normal.

I imagine they have had many of the same conversations in their board rooms since November 5th that have been bouncing around here. Might be prudent to get deep into 2025 to get a feel for the new landscape before going full speed into that project.
 

Sponsored

BigSkies

Well-Known Member
First Name
Brian
Joined
Sep 4, 2021
Threads
12
Messages
663
Reaction score
1,292
Location
Denver
Vehicles
R1T, Model Y
Clubs
 
I thought the site had been cleared and graded so wondering why it will take 12 months before they start construction. If they could do it sooner R3 could be 2027
not 2028. Must have their reasons, just curious.
It could just be a definition thing. "Construction" might mean assembling buildings, while they're spending the coming months with more detailed site planning, getting utilities run to the site, etc.

I'd also suspect things like ordering massive stamping machines and contracting the expertise to set up a paint shop are things with multi-year lead times, and involve a lot of the same people that are setting up Normal for the R2. There are some things in the world that can be expedited, and some things that can't.
 

dleepnw

Well-Known Member
Joined
May 13, 2021
Threads
130
Messages
2,767
Reaction score
3,074
Location
WA
Vehicles
Rivian, Toyota, Lexus
Clubs
 
R2 production will start in Normal, but ramp up to meet expected demand will require the Georgia plan. R3/R3X is slated for Georgia as well. 2028 is a long ways away for the R3/R3X. Rivian might be regretting revealing it too soon.
 

Mark_AZR1T

Well-Known Member
Site Sponsor
First Name
Mark
Joined
May 28, 2021
Threads
33
Messages
1,705
Reaction score
2,733
Location
Gilbert, AZ
Website
jackpucks.com
Vehicles
R1T Launch, R1S Canyon Red
Clubs
 
R2 production will start in Normal, but ramp up to meet expected demand will require the Georgia plan. R3/R3X is slated for Georgia as well. 2028 is a long ways away for the R3/R3X. Rivian might be regretting revealing it too soon.
I hope they can reach factory capacity, but I'm not so certain they will sell 155K R2's in the first few years....especially if the true production ramp doesn't happen until Q4 2026 or Q1 2027...competition should be fierce by then...very fierce.