lostpacket
Well-Known Member
- Thread starter
- #1
So it looks like the 320A service requirement was a mistake and Tom Moloughney contacted Ford about it and they have updated their website. Now it mentions 100A dedicated circuit but that is only if you want to deliver the max 80A to the truck (and back to the house as well).
Really hope we hear more about this from Rivian this year too as they said in the past the hardware is capable of it.
Sponsored