Sponsored
OP
OP
Craigins

Craigins

Well-Known Member
Joined
Jun 10, 2021
Threads
2
Messages
1,555
Reaction score
2,355
Location
Chicago Suburbs
Vehicles
Rivian R1T
Occupation
Software engineer
Clubs
 
oh i see now. the survey results are different from the forum thread. I did not manually compile the forum thread into the survey results. We've circulated the google survey throughout fb/reddit/forums for people to fill out. Some people fill out the forum poll and the survey, some just the forum poll, others just the survey.
Sponsored

 

SteveInBend

Well-Known Member
First Name
Steve
Joined
Oct 21, 2020
Threads
17
Messages
383
Reaction score
642
Location
Bend, Oregon
Vehicles
2022 El Cap R1T
Occupation
Retired
Unfortunately, I don't think the survey results are very reliable. Are there really 7 folks with R1S orders with LE and Max Pack who have received expected delivery windows in 2022? I thought that Rivian hadn't announced the Max Pack for the R1S. Has Rivian even announced any expected dates for the R1T with Max Pack?

It seems like some respondents have entered the dates they expect/want versus official notification from Rivian.
 

SeaGeo

Well-Known Member
First Name
Brice
Joined
Jan 12, 2021
Threads
47
Messages
5,235
Reaction score
9,676
Location
Seattle
Vehicles
Xc60 T8
Occupation
Engineer
Unfortunately, I don't think the survey results are very reliable. Are there really 7 folks with R1S orders with LE and Max Pack who have received expected delivery windows in 2022? I thought that Rivian hadn't announced the Max Pack for the R1S. Has Rivian even announced any expected dates for the R1T with Max Pack?

It seems like some respondents have entered the dates they expect/want versus official notification from Rivian.
There are clearly a few people who either selected the wrong trim or battery, or just don't know how to read. However, that's only about 2ish percent of respondents.
 

Mark K

Well-Known Member
First Name
Mark
Joined
Nov 24, 2020
Threads
1
Messages
51
Reaction score
36
Location
Lansing
Vehicles
2011 Volt
Occupation
Retired
There are clearly a few people who either selected the wrong trim or battery, or just don't know how to read. However, that's only about 2ish percent of respondents.
I didn't remember the difference between MaxPack and Large Pack. and chose the wrong one. There is no way to go back and edit the entry and the person who set this up doesn't correct it if a change is requested.
 

DaveA

Well-Known Member
First Name
David
Joined
Nov 17, 2020
Threads
12
Messages
1,896
Reaction score
3,348
Location
Texas
Vehicles
Rivian R1T
So I’m all alone in San Antone driving my R1T next year? ?.
 

Sponsored

kurtlikevonnegut

Well-Known Member
Joined
Sep 1, 2021
Threads
24
Messages
2,090
Reaction score
5,629
Location
SC/TX
Vehicles
R1T QM, Honda Odyssey
Clubs
 
So I’m all alone in San Antone driving my R1T next year? ?.
There's a chance I could be in the SA area next year. Whether or not I'll have my Rivian before the end of CY '22 is another story.
 

EV-X Oregon

Well-Known Member
First Name
Eric
Joined
Sep 10, 2019
Threads
2
Messages
54
Reaction score
59
Location
Ashland
Vehicles
Tesla Model 3, Volvo XC 60, BWM X5, Honda Odessey
Occupation
Principal Real Estate Broker
Just so everything doesn't get lost in the mega thread with the poll, I compiled the links to the survey, the spreadsheet results, the dashboard results, and a geojson here:

https://rivian.craiginsdev.com/

I manually generate the geojson so it won't be in sync with the spreadsheet and dashboard.

1637730964244.png


Enjoy!

Just a quick edit: https://rivian.craiginsdev.com/index2.html has the clustering enabled if you want to drill down into specific areas
Not sure where you'd like to receive the data.... but thanks for doing this!
Ordered April 2019, R1S LE, LA Silver, Ocean Coast, 22"s, delivery to Ashland Oregon= May-June 2022
 
OP
OP
Craigins

Craigins

Well-Known Member
Joined
Jun 10, 2021
Threads
2
Messages
1,555
Reaction score
2,355
Location
Chicago Suburbs
Vehicles
Rivian R1T
Occupation
Software engineer
Clubs
 
OP
OP
Craigins

Craigins

Well-Known Member
Joined
Jun 10, 2021
Threads
2
Messages
1,555
Reaction score
2,355
Location
Chicago Suburbs
Vehicles
Rivian R1T
Occupation
Software engineer
Clubs
 
Unfortunately, I don't think the survey results are very reliable. Are there really 7 folks with R1S orders with LE and Max Pack who have received expected delivery windows in 2022? I thought that Rivian hadn't announced the Max Pack for the R1S. Has Rivian even announced any expected dates for the R1T with Max Pack?

It seems like some respondents have entered the dates they expect/want versus official notification from Rivian.
The only dataset that will be perfect is the dataset that Rivian has that they use to generate the delivery schedules.

All surveys contain noise. The point isn't to pick out individual records of a dataset, but to observe trends in the whole dataset. Clearly this means pruning outliers, things like you have pointed out, when doing analysis.
 

EV-X Oregon

Well-Known Member
First Name
Eric
Joined
Sep 10, 2019
Threads
2
Messages
54
Reaction score
59
Location
Ashland
Vehicles
Tesla Model 3, Volvo XC 60, BWM X5, Honda Odessey
Occupation
Principal Real Estate Broker

Sponsored

Kialoa

Well-Known Member
First Name
Kialoa
Joined
Mar 10, 2019
Threads
1
Messages
54
Reaction score
255
Location
Massachusetts
Vehicles
911, Cayenne
Started looking at the data in the spreadsheet a bit more closely. While there is data that seems to have errors attached (LE AND MaxPack), some duplicates, and some dates typed incorrectly, there is enough to extract trends. I tried to remove most of the suspect entries and made a series of wild assumptions to see what could be learnt from the few hundred remaining data-sets. So far I focused on LE R1T data only. My thoughts so far:

1. The strongest correlation to Projected Delivery Date seems to be the Pre-Order date (Black line in Fig).
2. Within the contiguous 48 states location does not seem to play a significant role
3. Outside the Contig-48 and for Canada the delay seems to be 3-4 quarters (red line below).
4. The Exterior Color, Wheels, Spare, Off-road-Upgrade, and Accessories do not seem to play a significant role
5. Interior Color DOES seem to influence delivery dates. Black Mtn seems to be prioritized. Ocean Coast seems to have a 1-8 week delay, and Forest Edge seems to have the longest delay (4-10 weeks).

Not sure if Excel Figs are legible in this forum, but just in case they are - one of the Figs. I generated is included below. With more data - and more QC of the data - quite a few conclusions could be extracted. Even with the data in hand there is more that could be done to look at non-LE orders, and look at all the R1S data.

Rivian R1T R1S ? Rivian Delivery Window Survey Results [Data & Trend Analysis Added] survey_1-
 

SeaGeo

Well-Known Member
First Name
Brice
Joined
Jan 12, 2021
Threads
47
Messages
5,235
Reaction score
9,676
Location
Seattle
Vehicles
Xc60 T8
Occupation
Engineer
Started looking at the data in the spreadsheet a bit more closely. While there is data that seems to have errors attached (LE AND MaxPack), some duplicates, and some dates typed incorrectly, there is enough to extract trends. I tried to remove most of the suspect entries and made a series of wild assumptions to see what could be learnt from the few hundred remaining data-sets. So far I focused on LE R1T data only. My thoughts so far:

1. The strongest correlation to Projected Delivery Date seems to be the Pre-Order date (Black line in Fig).
2. Within the contiguous 48 states location does not seem to play a significant role
3. Outside the Contig-48 and for Canada the delay seems to be 3-4 quarters (red line below).
4. The Exterior Color, Wheels, Spare, Off-road-Upgrade, and Accessories do not seem to play a significant role
5. Interior Color DOES seem to influence delivery dates. Black Mtn seems to be prioritized. Ocean Coast seems to have a 1-8 week delay, and Forest Edge seems to have the longest delay (4-10 weeks).

Not sure if Excel Figs are legible in this forum, but just in case they are - one of the Figs. I generated is included below. With more data - and more QC of the data - quite a few conclusions could be extracted. Even with the data in hand there is more that could be done to look at non-LE orders, and look at all the R1S data.

View attachment 12237
nice job!
 

Kialoa

Well-Known Member
First Name
Kialoa
Joined
Mar 10, 2019
Threads
1
Messages
54
Reaction score
255
Location
Massachusetts
Vehicles
911, Cayenne
Since the last Fig was readable - thought I'd share the estimated impact of the interior color selection. The Black Mtn data is not shown again (was on last Fig) - and is only indicated by black line here. Forest Edge data is in Green with Red Text - clearly right-shifted (delayed). On closer inspection Ocean Coast data (light blue, Black Text) is more complex. Almost seems like a bimodal distribution - SOME of the orders are minimally (0-1 week) delayed wrt Black Mtn. Anther set of orders almost overlap with Forest edge delays. As always, there are some outliers...

Rivian R1T R1S ? Rivian Delivery Window Survey Results [Data & Trend Analysis Added] Survey_2


Rivian R1T R1S ? Rivian Delivery Window Survey Results [Data & Trend Analysis Added] survey_2-
 

Rhidan

Well-Known Member
Joined
Nov 25, 2020
Threads
9
Messages
585
Reaction score
1,505
Location
Denver
Vehicles
R1T
Started looking at the data in the spreadsheet a bit more closely. While there is data that seems to have errors attached (LE AND MaxPack), some duplicates, and some dates typed incorrectly, there is enough to extract trends. I tried to remove most of the suspect entries and made a series of wild assumptions to see what could be learnt from the few hundred remaining data-sets. So far I focused on LE R1T data only. My thoughts so far:

1. The strongest correlation to Projected Delivery Date seems to be the Pre-Order date (Black line in Fig).
2. Within the contiguous 48 states location does not seem to play a significant role
3. Outside the Contig-48 and for Canada the delay seems to be 3-4 quarters (red line below).
4. The Exterior Color, Wheels, Spare, Off-road-Upgrade, and Accessories do not seem to play a significant role
5. Interior Color DOES seem to influence delivery dates. Black Mtn seems to be prioritized. Ocean Coast seems to have a 1-8 week delay, and Forest Edge seems to have the longest delay (4-10 weeks).

Not sure if Excel Figs are legible in this forum, but just in case they are - one of the Figs. I generated is included below. With more data - and more QC of the data - quite a few conclusions could be extracted. Even with the data in hand there is more that could be done to look at non-LE orders, and look at all the R1S data.

View attachment 12237
How did you pick the estimated delivery date for each R1T from among the two month window given?
 

Kialoa

Well-Known Member
First Name
Kialoa
Joined
Mar 10, 2019
Threads
1
Messages
54
Reaction score
255
Location
Massachusetts
Vehicles
911, Cayenne
How did you pick the estimated delivery date for each R1T from among the two month window given?
One of the many assumptions I had to build in. I scaled this based on the order date, assuming the data we have are a normal distribution - which it is not. So those that ordered earliest I put near the beginning of the relevant delivery window, and those that ordered latest near the end of that delivery window. Certainly imperfect - but since this seems to be the driving prioritization variable, maybe not too far off. Of course this is most error prone for the delivery windows with fewest respondents (least normal population).
Sponsored

 
 




Top